Resources
Approach, evidence, tools and insights.
The thinking and the records behind our products and field services, the tools we use ourselves, and company news.
White paperLiquid Cooling Commissioning and Site AcceptanceInterface verification and release for single-phase cold-plate systems. Six boundaries, four release gates and the evidence each release requires. Free download.
Approach
How we decide what to build, what to test and what to write down.
- The whole thermal path, in six boundaries
- Return-water grade and who can buy the heat
- The three clocks of leak risk
Evidence
What we hand over, and the criteria it is tested against.
- Commissioning and acceptance criteria
- White paper: Liquid Cooling Commissioning and Site Acceptance
- The turnover package
- Sample records (templates)
- Ten leak points
- Standards we follow
- The numbers Canada's principles ask for
Tools
Check your own numbers before you bring them to us or anyone else.
- Liquid cooling simulator
- CDU and equipment catalog
- Return-water grade → heat buyers
- CDU approach and free-cooling estimator
- Turnover self-check
Insights
Every Watt Counts: long-form writing on power, liquid cooling and heat reuse.
- The Bubble Lays the Rails
- Three AI Rivals Called for a Slowdown. Here Is What Our Side of the Industry Owes.
- The Biggest Risk in Liquid Cooling Is Not Whether It Leaks. It Is When.
News
Company announcements: events, new tools and training, published guidance.
- NextGenergy publishes a white paper on commissioning and site acceptance for liquid-cooled AI data centres
- NextGenergy at GDCC 2026
- NextGenergy joins NVIDIA Inception
OCP, ASHRAE, DMTF and other names are the property of their respective owners. Their mention does not imply endorsement or affiliation.
