Selected against load, operating temperatures, flow, pressure drop, redundancy and serviceability, with the rating conditions stated.

A CDU's nameplate capacity is a number at one approach temperature. The approach is what matters: it sets how warm the secondary loop runs for a given facility supply, which sets your free-cooling hours and your return-water grade at the same time. A few kelvin of approach can be worth hundreds of hours a year in a temperate climate.

Published approach targets now cluster at 3–4 K. Google's Project Deschutes, the first CDU specification submitted to the Open Compute Project (v1.0 released in February 2026), lists 3 K at a 2,000 kW thermal load with 500 gpm on both loops; KAORI, a heat-exchanger maker, cites 4 K or less as a common design target, and AVC states its CDUs are designed to 4 K. The last two are manufacturer statements, not independent tests. An approach figure is only comparable when it comes with the load fraction, the flow on both sides and the fluid, so we ask for all three.

Filtration has tightened with the cold plates it protects. One CDU maker now describes 25 µm full-flow filtration on the secondary loop as the new default, replacing 50 µm; another describes 25–50 µm full flow plus side-stream filtration below 5 µm on about a tenth of the flow, and Deschutes adds a 0.2 µm side-stream loop. We write the filter rating, the basis of that rating and the change-out pressure drop into the CDU specification.

We select CDUs from several manufacturers against the project's approach, turndown and redundancy requirements, and we require the manufacturer's FAT for pump seals, heat-exchanger gaskets and filter housings, the enclosed boundaries that leak quietly.

Specification and interfaces

The fields buyers compare. Values depend on the configuration, so we do not publish one set of numbers; each project gets a data sheet with every row filled in at stated conditions.

FieldHow it is statedValue
Rated heat load and rating conditionskW at a stated facility supply temperature, secondary supply temperature, approach and fluidConfigured per project; data sheet on request
Primary (facility) flow and pressure dropFlow at rated load and the pressure drop across the CDU at that flowConfigured per project; data sheet on request
Secondary (TCS) flow and available pressureFlow at rated load and the external pressure available to the rack loop at that flowConfigured per project; data sheet on request
Pump redundancyN, N+1 or 2N; whether pumps can be replaced while running; staging logicConfigured per project; data sheet on request
Maximum allowable working pressureFor each loop, with the factory test pressureConfigured per project; data sheet on request
Wetted materialsMetals, elastomers and plastics in contact with each fluid, namedConfigured per project; data sheet on request
Coolant compatibilityFluids and glycol concentrations the unit is rated forConfigured per project; data sheet on request
FiltrationFull-flow rating and its basis; side-stream filtration if fitted; change-out pressure dropConfigured per project; data sheet on request
Interfaces and communicationsPipe connection type and size; control and monitoring protocols; alarms and signals exchangedConfigured per project; data sheet on request
Dimensions and weightFootprint, height, dry and operating weightConfigured per project; data sheet on request
Service clearancesFront, rear, side and top access needed for maintenanceConfigured per project; data sheet on request
Scope of supplyWhat is included and what is not: controls, sensors, first fill, factory test, commissioning supportConfigured per project; data sheet on request
Numbers on this page, with their conditions and sources (2)
≤ 4 KPublished CDU approach-temperature targets cluster at 3–4 K.Condition: Approach between facility supply and secondary (TCS) supply. One primary specification and two manufacturer statements: Project Deschutes lists 3 K at a 2,000 kW thermal load with 500 gpm on both loops; KAORI cites ≤ 4 K as a common design target for brazed-plate heat exchangers; AVC states its CDUs are designed to 4 K. A quoted approach is comparable only with its load fraction, the flow on both sides and the fluid stated. Source: OCP APAC Summit 2026, Cooling Environments: Google, "Project Deschutes Update V1.0" (E. Kung); KAORI, "Enabling High-Density Data Center Cooling: The Critical Role of Brazed Plate Heat Exchangers" (M. Lu); AVC, "Advanced Thermal Management for High-Density AI Servers: Cold Plate Optimization and CDU Specification Requirements" (F. Lin).
25 µmFull-flow filtration on the secondary (TCS) loop is moving to 25 µm, replacing the earlier 50 µm default.Condition: Full-flow filter rating on the technology-cooling loop. AVC describes 25 µm as the new CDU standard; Cooler Master gives 25–50 µm full-flow plus side-stream filtration below 5 µm on about 10 % of flow; Google's Project Deschutes 2 MW CDU adds a 0.2 µm side-stream loop. Manufacturer statements; the efficiency basis of the rating must be stated per filter. Source: OCP APAC Summit 2026, Cooling Environments: AVC, "Advanced Thermal Management for High-Density AI Servers" (F. Lin); Cooler Master, "CDU Filter Health & Reducer-Induced Bubble Formation" (R. Hsieh).