The projects behind our figures. All were delivered by our founding team through the company they built before NextGenergy; none is presented as a NextGenergy installed base.

Nearly 1,000 MWOur founding team has delivered nearly 1,000 MW of liquid cooling.Condition: Cumulative capacity of liquid-cooling equipment (immersion and direct-to-chip systems, CDUs and heat-recovery units) delivered by the founding team through the company they built before NextGenergy, counted to the first quarter of 2026 and rated by the IT heat load it serves; equipment delivered, not capacity currently in operation, and not a NextGenergy installed base; not third-party audited.

Representative projects

Each project is described in the same six fields. Locations and clients are not named. Scale is liquid-cooled IT capacity where it is published; it measures equipment delivered, not the heat supplied to users. Heating results are stated only where the project's operating record supports them; the operating records, system diagrams and acceptance records are not published.

2021Asia25 MW

Immersion cooling · residential heating

Project conditions
25 MW liquid-cooled IT capacity, Asia, 2021. Location and client not named.
Scope of delivery
Liquid cooling with waste-heat recovery, delivered by the founding team through their earlier company. The split between equipment supply, design, integration and operation: explained under a non-disclosure agreement.
System architecture
Immersion liquid cooling; recovered heat supplies space heating to a residential community.
Key operating conditions
Supply and return temperatures, heat delivered: explained under a non-disclosure agreement.
Operating observation period
In the project year 2021; the operating record and its dates: explained under a non-disclosure agreement.
System diagrams and acceptance records
Not published; explained under a non-disclosure agreement.
2023Asia12 MW

Direct-to-chip cooling · aquaculture

Project conditions
12 MW liquid-cooled IT capacity, Asia, 2023. Location and client not named.
Scope of delivery
Cold-plate liquid cooling with heat recovery, delivered by the founding team through their earlier company. Division of design, integration and operation: explained under a non-disclosure agreement.
System architecture
Cold-plate liquid cooling; recovered heat is supplied to industrial aquaculture ponds.
Key operating conditions
Measured pond temperature about 25 °C (project operating record, not published). The measured range and allowed variation: explained under a non-disclosure agreement.
Operating observation period
In the project year 2023; the operating record and its dates: explained under a non-disclosure agreement.
System diagrams and acceptance records
Not published; explained under a non-disclosure agreement.
2024Asia, above 3,000 m altitudeNot published

Heat reuse · space heating

Project conditions
Above 3,000 m altitude, Asia, 2024. Capacity not published; location and client not named.
Scope of delivery
Heat-reuse system with a redesigned CDU, delivered by the founding team through their earlier company. Other scope: explained under a non-disclosure agreement.
System architecture
Waste heat used for space heating. When the heating side needed a higher supply temperature in cold weather, the CDU was redesigned with a tighter approach temperature, so the loop could deliver warmer water without running the chips hotter.
Key operating conditions
The approach temperature before and after the redesign, and the supply temperature reached: explained under a non-disclosure agreement.
Operating observation period
In the project year 2024; the operating record and its dates: explained under a non-disclosure agreement.
System diagrams and acceptance records
Not published; explained under a non-disclosure agreement.
2025Asia20 MW

Heat recovery · commercial heating

Project conditions
20 MW, Asia, 2025. Location and client not named.
Scope of delivery
Heat-recovery system, delivered by the founding team through their earlier company. Division of design, integration and operation: explained under a non-disclosure agreement.
System architecture
A heat-recovery system supplying heating to commercial buildings.
Key operating conditions
Supply and return temperatures, heat delivered: explained under a non-disclosure agreement.
Operating observation period
In the project year 2025; the operating record and its dates: explained under a non-disclosure agreement.
System diagrams and acceptance records
Not published; explained under a non-disclosure agreement.

NextGenergy was incorporated in 2025. Projects delivered by NextGenergy will be added here as they are handed over. Further detail on these four projects is explained only under a non-disclosure agreement; contact us to discuss. Read more about the team on Leadership, and about heat reuse in Waste Heat Becomes an Asset.