Nearly 1,000 MWOur founding team has delivered nearly 1,000 MW of liquid cooling.Condition: Cumulative capacity of liquid-cooling equipment (immersion and direct-to-chip systems, CDUs and heat-recovery units) delivered by the founding team through the company they built before NextGenergy, counted to the first quarter of 2026 and rated by the IT heat load it serves; equipment delivered, not capacity currently in operation, and not a NextGenergy installed base; not third-party audited.
Representative projects
Each project is described in the same six fields. Locations and clients are not named. Scale is liquid-cooled IT capacity where it is published; it measures equipment delivered, not the heat supplied to users. Heating results are stated only where the project's operating record supports them; the operating records, system diagrams and acceptance records are not published.
2021Asia25 MW
Immersion cooling · residential heating
- Project conditions
- 25 MW liquid-cooled IT capacity, Asia, 2021. Location and client not named.
- Scope of delivery
- Liquid cooling with waste-heat recovery, delivered by the founding team through their earlier company. The split between equipment supply, design, integration and operation: explained under a non-disclosure agreement.
- System architecture
- Immersion liquid cooling; recovered heat supplies space heating to a residential community.
- Key operating conditions
- Supply and return temperatures, heat delivered: explained under a non-disclosure agreement.
- Operating observation period
- In the project year 2021; the operating record and its dates: explained under a non-disclosure agreement.
- System diagrams and acceptance records
- Not published; explained under a non-disclosure agreement.
2023Asia12 MW
Direct-to-chip cooling · aquaculture
- Project conditions
- 12 MW liquid-cooled IT capacity, Asia, 2023. Location and client not named.
- Scope of delivery
- Cold-plate liquid cooling with heat recovery, delivered by the founding team through their earlier company. Division of design, integration and operation: explained under a non-disclosure agreement.
- System architecture
- Cold-plate liquid cooling; recovered heat is supplied to industrial aquaculture ponds.
- Key operating conditions
- Measured pond temperature about 25 °C (project operating record, not published). The measured range and allowed variation: explained under a non-disclosure agreement.
- Operating observation period
- In the project year 2023; the operating record and its dates: explained under a non-disclosure agreement.
- System diagrams and acceptance records
- Not published; explained under a non-disclosure agreement.
2024Asia, above 3,000 m altitudeNot published
Heat reuse · space heating
- Project conditions
- Above 3,000 m altitude, Asia, 2024. Capacity not published; location and client not named.
- Scope of delivery
- Heat-reuse system with a redesigned CDU, delivered by the founding team through their earlier company. Other scope: explained under a non-disclosure agreement.
- System architecture
- Waste heat used for space heating. When the heating side needed a higher supply temperature in cold weather, the CDU was redesigned with a tighter approach temperature, so the loop could deliver warmer water without running the chips hotter.
- Key operating conditions
- The approach temperature before and after the redesign, and the supply temperature reached: explained under a non-disclosure agreement.
- Operating observation period
- In the project year 2024; the operating record and its dates: explained under a non-disclosure agreement.
- System diagrams and acceptance records
- Not published; explained under a non-disclosure agreement.
2025Asia20 MW
Heat recovery · commercial heating
- Project conditions
- 20 MW, Asia, 2025. Location and client not named.
- Scope of delivery
- Heat-recovery system, delivered by the founding team through their earlier company. Division of design, integration and operation: explained under a non-disclosure agreement.
- System architecture
- A heat-recovery system supplying heating to commercial buildings.
- Key operating conditions
- Supply and return temperatures, heat delivered: explained under a non-disclosure agreement.
- Operating observation period
- In the project year 2025; the operating record and its dates: explained under a non-disclosure agreement.
- System diagrams and acceptance records
- Not published; explained under a non-disclosure agreement.
NextGenergy was incorporated in 2025. Projects delivered by NextGenergy will be added here as they are handed over. Further detail on these four projects is explained only under a non-disclosure agreement; contact us to discuss. Read more about the team on Leadership, and about heat reuse in Waste Heat Becomes an Asset.